InstagramLinked InNextdoorYouTube

May 9, 2025 Update

Upcoming
Construction is scheduled to begin on Monday, May 12th.  While the roadways will remain accessible, signage will be installed to indicate ongoing road work, specifically the grinding of the existing roadway. Simultaneously, crews will start laying out temporary water piping throughout the designated project areas.
Underground utility construction is slated to begin the week of May 19th. During this period, 9th St. and 3rd Ave NW will be closed to traffic.