October 31, 2025 Update

Street Closures
3rd Ave, 9th Street, and 7th Street from 4th Ave to CSAH 5 have base asphalt pavement. Restoration in these areas are ongoing. Do not park on the roadways during construction hours.  
7th St from 4th Ave to 6th Ave remains closed.
 
Update
7th Street road building operations through aggregate section in preparation for asphalt paving is complete. Asphalt paving remaining roadway is anticipated to take place the week of 11.3.25. 
Sidewalks and driveways along 7th St. have been completed. Due to the paving schedule, access ramps are not anticipated to be needed for the 11.4.25 returned driveway use.
Ongoing restoration work along all areas that have concrete and asphalt paving work completed.
Maintain garbage can address labels to ensure they are returned properly.
 
Mail
3rd Avenue Residents: Temporary mailboxes are located at the NW corner of 9th St and 3rd Ave.  Mail is being delivered to this location.   
7th Street Residents: Temporary mailboxes are located at the NW corner of 7th St. and 2nd Ave.  Mail is being delivered to this location.
Mailboxes will begin being re-installed.  Mail will still be delivered to the designated mail bank until all mailboxes have been set and communicated through to the post office to resume delivering to the individual mailboxes.
 
Safety
Slow down through construction zone. Driveway access will be limited during work hours, parking on side streets may be required.