November 14, 2025 Update

Street Closures
All base asphalt pavement has been completed. Restoration in these areas are ongoing. Do not park on the roadways during construction hours.  With ongoing restoration work, the roads will remain closed to thru traffic to accommodate construction operations.
 
Update
Ongoing restoration work throughout the entire project.
 
Mail
Mailboxes are being re-installed.  Mail banks will be removed Monday 11.17.25 and regular delivery will resume.
 
Safety
Slow down through construction zone. Driveway access will be limited during work hours, parking on side streets may be required.