November 7, 2025 Update
Street ClosuresAll base asphalt pavement has been completed. Restoration in these areas are ongoing. Do not park on the roadways during construction hours. UpdateOngoing restoration work throughout the entire project. Mail3rd Avenue Residents: Temporary mailboxes are located at the NW corner of 9th St and 3rd Ave. Mail is being delivered to this location. 7th Street Residents: Temporary mailboxes are located at the NW corner of 7th St. and 2nd Ave. Mail is being delivered to this location.Mailboxes are being re-installed. Mail will still be delivered to the designated mail bank until all mailboxes have been set and communicated through to the post office to resume delivering to the individual mailboxes. SafetySlow down through construction zone. Driveway access will be limited during work hours, parking on side streets may be required.